Manufacturing
Material
Request
1 min
using for material form request general area work group?? select the work group for the material request start date?? put the start date for the material request end date?? put the end date for the material request request type?? select the request type for the material request consolidated consolidated no field on the left name of the numbering series select a series field on the right the number of the material request posting date specify the posting date the default value is the date on which the material request is created if required, change the date draft?? display the status of the draft yes or no consider min stock in requirements?? tick the check box if required to consider min stock in requirements
